Fall is in full swing and excitement is in the rapidly cooling air. As major league baseball teams chase dreams of championship glory, we are continuing to chase the dream of having a place for our students through our Rise and Build campaign. Here are the most recent achievements we are able to celebrate…
· In the ToonTown control booth, five steel corner trims and top rail on walls have been installed. The top rail has been stained. Eight outlets and covers have been installed. A counter with drop inset for computer screens has been built and installed. Countertop trim and booth walls and trim have been painted.
· For the ToonTown restroom veranda, the roof has been framed. Lattice on the roof, facia and gable trim have been installed. Electrical for two lights, one switch, and two outlets has been roughed in. Columns, beam, knee wall, and doors have been trimmed. Plywood veneer, batten strip, two lights, two outlets, single-pole light switch, and trim have been installed. The roof, walls, and trim have been painted.
· On the ToonTown main floor, 11 accent lights, six audience lights, an 86” tv, 115” AFF, 12 outlets and outlet covers, four sconces, a switch leg for sconces in the control booth, and a four-way switch for house lights in the control booth have been installed.
· On the ToonTown main stage, two speaker covers for woofers have been painted and installed. Control wiring to four woofers and eight sheets of plywood have been installed. Trim on the stage front has been painted and installed.
We clearly have quite a bit to celebrate while quite a bit remains to be done. We can be confident that our work will be successful because the dream we are chasing was given to us from the Lord. The best is yet to come. Thank you for all of your prayer and support as we continue to Rise and Build!
· In the ToonTown control booth, five steel corner trims and top rail on walls have been installed. The top rail has been stained. Eight outlets and covers have been installed. A counter with drop inset for computer screens has been built and installed. Countertop trim and booth walls and trim have been painted.
· For the ToonTown restroom veranda, the roof has been framed. Lattice on the roof, facia and gable trim have been installed. Electrical for two lights, one switch, and two outlets has been roughed in. Columns, beam, knee wall, and doors have been trimmed. Plywood veneer, batten strip, two lights, two outlets, single-pole light switch, and trim have been installed. The roof, walls, and trim have been painted.
· On the ToonTown main floor, 11 accent lights, six audience lights, an 86” tv, 115” AFF, 12 outlets and outlet covers, four sconces, a switch leg for sconces in the control booth, and a four-way switch for house lights in the control booth have been installed.
· On the ToonTown main stage, two speaker covers for woofers have been painted and installed. Control wiring to four woofers and eight sheets of plywood have been installed. Trim on the stage front has been painted and installed.
We clearly have quite a bit to celebrate while quite a bit remains to be done. We can be confident that our work will be successful because the dream we are chasing was given to us from the Lord. The best is yet to come. Thank you for all of your prayer and support as we continue to Rise and Build!