We have entered the month where thanks is given for all of God’s blessings. Among the things we are most thankful for at North Cleveland is the progress that has been made in our Rise and Build campaign. Here are the most recent reasons we have to be thankful…
· On the ToonTown main stage, 80% of the walls, seven different rooflines, and two puppet platforms have been framed. Handrails and carpet have been installed on the puppet platforms. Two ship ladders have been built and installed. Sheetrock has been installed on all walls on the audience side and the right soffit lower roof. Sheetrock has been mudded where needed. Two wall screens have been primed and trimmed. Two flat roofs have been trimmed. The right wall has been primed for shiplap. All brick veneer and two doors have been installed. Speaker wiring to the control room has been installed.
· Plans are in progress for the removal of the white house. At this time, the lean-to and garage have been removed.
The progress we have seen thus far is evidence of God’s faithfulness and God’s blessings extended toward us. Many more reasons to give thanks are soon to come. As we thank God for what He has done, we want to thank you for your faithfulness in prayer and giving toward the completion of this project. Your support is one of the main reasons we can continue to Rise and Build!
· On the ToonTown main stage, 80% of the walls, seven different rooflines, and two puppet platforms have been framed. Handrails and carpet have been installed on the puppet platforms. Two ship ladders have been built and installed. Sheetrock has been installed on all walls on the audience side and the right soffit lower roof. Sheetrock has been mudded where needed. Two wall screens have been primed and trimmed. Two flat roofs have been trimmed. The right wall has been primed for shiplap. All brick veneer and two doors have been installed. Speaker wiring to the control room has been installed.
· Plans are in progress for the removal of the white house. At this time, the lean-to and garage have been removed.
The progress we have seen thus far is evidence of God’s faithfulness and God’s blessings extended toward us. Many more reasons to give thanks are soon to come. As we thank God for what He has done, we want to thank you for your faithfulness in prayer and giving toward the completion of this project. Your support is one of the main reasons we can continue to Rise and Build!